[Bug 39414] New: Add a partway job status
wine-bugs at winehq.org
wine-bugs at winehq.org
Sat Oct 10 08:07:35 CDT 2015
https://bugs.winehq.org/show_bug.cgi?id=39414
Bug ID: 39414
Summary: Add a partway job status
Product: Wine-Testbot
Version: unspecified
Hardware: x86
OS: Linux
Status: NEW
Severity: normal
Priority: P2
Component: unknown
Assignee: wine-bugs at winehq.org
Reporter: fgouget at codeweavers.com
Distribution: ---
If a task is completed the corresponding job's status is 'Running' even if none
or the remaining tasks is actually Running. So one can sometimes end up with
dozens of 'Running' jobs when only one or two among them actually has an active
task.
So the idea would be to reserve the 'Running' status to jobs for which one task
is actually running. Jobs where some tasks but not all have completed would
instead have the 'Partway' status (suggestions for another name welcome).
Another issue is that when multiple jobs are in the 'Running' or 'Partway'
state it's hard to know which ones have been modified the most recently because
the 'Ended' field is not set. This is probably less important though and a
waterfall like presentation would help (see bug 39413).
--
Do not reply to this email, post in Bugzilla using the
above URL to reply.
You are receiving this mail because:
You are watching all bug changes.
More information about the wine-bugs
mailing list