Updated 1.0.0 release criteria; draft 1.0.0 release plan
James McKenzie
jjmckenzie51 at sprintpcs.com
Sat Mar 15 19:13:54 CDT 2008
Dan Kegel wrote:
> On Sat, Mar 15, 2008 at 11:04 AM, Alexandre Julliard
> <julliard at winehq.org> wrote:
>
>> > http://wiki.winehq.org/WineReleasePlan
>>
>> We need a code freeze and stabilization period before the release. My
>> thinking is that we should have a 1.0rc1 release, probably sometime in
>> May, and from that point on only accept small obvious fixes. Then we'd
>> have rc2, rc3, etc. as needed until the bug list gets small enough. And
>> by rc1 (or even earlier) any bug that requires more than a small simple
>> patch would be deferred to 1.1.0.
>>
>
> How's it look now?
> - Dan
>
>
>
Dan:
How much of a pain would it be to switch to weekly releases during the
rc period to catch patches and regresssions?
James
More information about the wine-devel
mailing list